What work is done with a small-scale license?
- test sections of the ground and excavation following a document of the Archaeological Service and for works required for geotechnical research.
- placement of prefabricated houses, to cover housing needs of disadvantaged and special groups of the population
- pumping facilities and buildings with the absolutely necessary dimensions for their housing
- construction of underground cemetery facilities
- installation of temporary structures
- construction of an elevator
- cutting of trees in approved road plans, Z.O.E., as well as in settlements
- underground gas distribution or metering and regulation stations
- installation of scaffolding
- installation of construction sites
- excavations of cable ducts inside the fields or plots of petrol stations for the installation of the input-output systems
- exterior painting work or replacement of railings or repair of coatings or repair of facades, using scaffolding
- cladding of facades and replacement of glass curtains, using scaffolding
- construction of a pergola with a surface of more than fifty (50) sq.m. in uncovered areas, courtyards, ground floor terraces and construction of pergolas on roofs, open spaces and open balconies regardless of surface
- installation of an empty water tank or swimming pool, with a maximum area of fifty (50) sq.m., of the compa type.
- ventilation ducts and other installations
- interior arrangements, as well as change of use works for which the issuance of a building permit is not required, provided that the elements of the load-bearing structure of the building are not affected and the loads and the category of seismic importance are not changed for the worse according to seismic regulation
- construction of planted rooms and planted areas
- installation of external thermal insulation or passive solar systems on the external faces
- maintenance and repair of roofs using scaffolding
- simple fencing from stone construction up to a height of one (1.00) meter or fencing made of light field material in off-plan areas and in settlements without a city plan
- fencing with rough construction, such as wire mesh, on plots not paved in areas within the plan
- construction of a single stone warehouse per cultivated farm, with an area of up to fifteen (15) square meters and a total height of up to three (3.00) meters, after approval by the competent Department of Agriculture
- construction of stoves and ovens with their chimneys, for professional use
- construction of fireplaces with their chimneys in horizontal properties using a house
- roof reconstruction
- functional joining of spaces
- installation of antennas, other than radio and television signal reception antennas, as well as radio and mobile telephony antennas
- installation of autonomous heating system
- canopies and shelters, subject to conditions
- interventions on the facades of buildings to modify or open new openings, where permitted
- makeshift wooden constructions for auxiliary use up to 8 sq.m. and a maximum height of 2.50 meters, which are placed in the uncovered area
- installation works of PV systems
- wind turbine installation works
- separation of horizontal properties
- installation of noise protection structures (sound curtains) on roofs or in uncovered areas of existing special buildings, in order to dampen sounds coming from air conditioners
- installation of prefabricated kindergarten rooms, outside traditional settlements
- constructions inside the plot-field for the creation of entrance spaces in the plots and fields
- installation of Small and large Green Points
Our team undertakes all the necessary actions for the processing of Small Scale Permits for your property. We will be happy for you to come to our site to discuss further details.